(02) 4964 8552
A large industrial floor pour fed by an HVCPS boom pump
Our Track Record

Delivering Projects Since 1980

Our work reflects the capability of our fleet and the expertise of our operators. Explore a selection of projects we’ve helped deliver, backed by decades of concrete pumping experience.

Named work

Pours you can point at

Gold Coast University Hospital

Major health infrastructure, poured at scale and to hospital-build specification, our biggest interstate deployment.

Port Waratah Coal Services

Infrastructure works at one of the world's biggest coal export terminals, on our own doorstep at Kooragang.

Ausgrid Stadium, Newcastle

Stadium works for the city's home ground, the kind of public structure a local fleet takes personally.

Marketown East, Newcastle

Retail centre works in the city's West End, poured around trading hours and a working precinct.

One Apartments, Newcastle

Multi-storey residential decks placed floor by floor with the high rise system.

M12 Motorway, Sydney

Civil structures on Sydney's newest motorway corridor, pumped for major civil contractors.

Contract history with national builders

The fleet has carried long infrastructure contracts across the region: Pacific Highway upgrades between Newcastle and Bulahdelah and the F3 extensions with ABI Group, the Bulahdelah bypass with Baulderstone, Newcastle to Kurri F3 works with Thiess, the Kooragang Island coal loader with Laing O'Rourke and Daracon, and Maitland to Minimbah rail work with John Holland. Contract work like that is won on compliance, uptime and pour discipline, and kept the same way.

On the job

From the gallery

Deck reinforcement ready ahead of a pour, Sydney Metro Pyrmont East Placing concrete below the city at Sydney Metro Pyrmont East Part of the 650 m line push through the tunnel at Pyrmont East The crew working a binding pour on the Sydney Metro job Fresh slab coming up inside the Sydney Metro works Barge-mounted placing boom on the M12 headstock pour Early start on the M12 headstock job Agitators loading the pump for underground drift pours Putzmeister Moli rigged on the mine job First pour-through at the Forster project with the Schwing SPB35 placing boom Deck reinforcement at the Forster project Pumping over the water on a river crossing at sunrise Twin booms at first light Boom working a high-rise deck pour 56m Putzmeister reaching into a station box Boom pump over a commercial pour

Photos are from our own jobs. Click any photo for a closer look.

Book a pump

Tell us about the pour

Volume, date, and what the access looks like. We will come back with the right unit for the job, and if the site is tricky we will look at it first.

An HVCPS boom pump set up on a job site