
Since 1980, we’ve been saying “yes” to the challenging pours others won’t or can’t take on.
Family-owned and operating from our Tomago and Dubbo depots, we service high-rise, commercial, civil, mining, industrial and residential projects Australia-wide. Our extensive fleet and decades of experience help us deliver on even the most demanding pumping requirements.
Truck-mounted boom pumps from 20 to 58 metres for slabs, footings, decks and large-volume pours. Our expert operators bring the experience and precision to match each unit to your site and pumping requirements.
Explore boom pumps →From small grout jobs and residential driveways to major commercial, civil and mining pours, our line and trailer pumps cover projects of all sizes. We supply expert operators, pipeline and linesmen, with long-distance pumping capabilities of up to 2 kilometres.
Explore line pumps →Separate placing booms and high-pressure pumps operated by our expert team, with vertical pipelines planned floor by floor. Our water wash system provides controlled line cleaning for multi-storey projects.
Explore high-rise pumping →Sprayed concrete for ground support, tanks, pools and mining infrastructure. Different equipment, different crews, same standards.
Sprayed concrete →The pours that do not fit a standard setup: long static lines, barge mounted booms, underground works and staged industrial pours, engineered per job.
Specialist work →Equipment hire without our crew, for contractors with their own operators. Talk to us about the unit and the terms.
Dry hire →A line pump sits where the agitator trucks can get to and pushes concrete through steel and rubber line to the pour: basement slabs poured from the street, pools with no side access, tunnels, tank bases inside live plants. Our trailer fleet runs from 22 to 102 cubic metres an hour, with high pressure units for the long runs, and we supply the pipeline and the linesmen to lay, clamp and strip it.
Some pours do not fit a standard setup. We have pushed concrete 650 metres through the Sydney Metro tunnel, run 1,550 metres of line into underground coal mine drifts, poured bridge headstocks from a barge mounted placing boom, and engineered freestanding ballast frames where a boom had nothing to stand on. If the pour is unusual, that is the part we enjoy.
Contractors with their own operators can hire equipment from the fleet without our crew. Availability, terms and which units are offered depend on the job, so call and talk it through.
The fleet was built up servicing Hunter Valley mining and it shows in how we run: inductions current, equipment maintained to site standards, operators used to working under supervision regimes. The same discipline turns up on a house slab.
Volume, date, and what the access looks like. We will come back with the right unit for the job, and if the site is tricky we will look at it first.